The rain stopped just before 10 a.m! 10 of us met at the Rhydyblewin entrance and set to work.
The painting of the new gate was postponed (it was too wet) so we started to tackle the undergrowth which threatened to take over the path.
Periods of rain and the warm weather has meant a take over bid by the brambles, bracken and nettles but we gradually made inroads and the task was completed by Kevin and the machinery on Monday.